To install a solar roof mount on a shingle roof you find the center of a rafter, lift the shingle course above your mark, pull the nails that are in the way, drill a pilot hole into the rafter, fill it with sealant, slide the flashing up under that course and drive the lag through the foot until the sealing washer is seated. Most flashed mounts for 5/16 inch lags call for a 7/32 inch pilot, and some call for 1/4 inch. The two things that cause most leaks are a flashing that rides on a nail head and a lag driven so hard it crushes the washer.
TL;DR
- Put the lag in the middle third of the rafter, not in the deck. On a 2x rafter that strip is only about 1/2 inch wide.
- Most flashed mounts for 5/16 inch lags want a 7/32 inch pilot. Some want 1/4 inch. The mount maker's sheet wins every time.
- Pull the nails in the flashing's path. A flashing that rides on a nail head does not lie flat and does not shed water.
- The flashing goes under the course above the hole, never on top of the shingles. Sealant backs it up; it does not replace it.
- Seat the lag and stop. Most sheets give no lag torque, only "fully seated" with the sealing washer snug, not squeezed out.
Table of Contents
- How a flashed mount keeps water out
- Pilot holes and lag sizes
- Before you climb
- How to install a solar roof mount, step by step
- What most roof mount advice gets wrong
- Our perspective
- The tools for flashed roof attachments
- FAQ
- Sources
How a flashed mount keeps water out
A flashed shingle mount is a flat metal flashing, a foot that sits on it, and a lag through both into a rafter. The flashing keeps the water out only if it is shingled in like any other course.
- The flashing tucks under the course above. One maker's guide says a correctly placed flashing will extend under the two courses of shingles above the pilot hole. Another has it slide between the first and second courses, reach under the third and not overhang the course below.
- The hole sits a set distance below the shingle edge. The sheets give the number and it varies. One says to move down 2-1/4 inches from the bottom of the shingle; another snaps its row lines 1-3/4 inches below the upslope edge of the course.
- A sealing washer closes the lag hole. Commonly rubber bonded to steel. Seated, it seals. Crushed, it leaks and must be replaced.
The roofing trade is clear on what does the sealing. The roofing contractors' magazine, reporting on the asphalt roofing manufacturers' 2022 manual, says it tells installers that caulks and sealants should not be relied upon to stop water, and that mounts should use flashing flanges that can be shingled in.
Pilot holes and lag sizes
Every mount sheet cited here calls for a pilot hole, drilled square to the roof and into the center of the rafter. What they say about size:
- 7/32 inch is the common pilot for 5/16 inch lags. Most of the sheets cited here call for it, including one that pairs its 5/16 inch lag with a 7/32 inch drill bit.
- Some mounts want 1/4 inch. One racking maker's manual lists 1/4 inch pilots and a 7/16 inch socket for its own flashed foot, and 7/32 inch for other mounts in the same book.
- The wood research gives a range, not one number. The federal wood handbook puts the lead hole for a lag's threaded part at 40 to 70 percent of the shank in low density softwoods and 60 to 75 percent in Douglas fir and southern pine. A 7/32 inch hole is about 70 percent of a 5/16 inch lag. A 1/4 inch hole is about 67 percent of a 3/8 inch lag.
A standard 5/16 inch hex lag has a 1/2 inch head and a 3/8 inch lag a 9/16 inch head. Lags shipped with a mount do not always follow that: the flashed foot above takes a 7/16 inch socket.
Read the mount sheet for two numbers before you climb: the pilot size and the socket size. Neither one is universal.
Before you climb
- Fall protection. Federal rules require workers in residential construction 6 feet or more above a lower level to be protected by guardrails, safety nets or a personal fall arrest system.
- The mount maker's sheet. Pilot size, socket size, hole position, sealant, and whether impact is allowed.
- Shingle temperature. One shingle maker warns that in hot weather it is easier to scuff or damage the roof, and says mornings or cool days usually are the optimal time to break the shingle seal.
- Parts. Flashings, feet, lags with sealing washers, and a sealant both the roofing and mount makers approve.
- Bring. A drill for the round shank pilot bits, a long series bit if your pilot runs deep, an impact driver, a chalk line or laser line, a caulk gun and a stud finder.
How to install a solar roof mount, step by step
- Find the rafter. Use a stud finder or measure from rafters you can see in the attic or at the eaves. Most run 16 or 24 inches on center. Mark the center line, because one mount guide says lag bolts must be located in the middle third of the member.
- Lay out the rows. Snap lines and mark each hole at the distance below the shingle edge your sheet gives.
- Lift the course above. Slide a flat bar under the shingle above your mark and break the sealant strip slowly, working out to each side. The shingle maker's bulletin warns that damaged shingles must be replaced.
- Pull the nails in the way. Dry fit the flashing over the mark. If a nail stops it, pull the nails out carefully so the shingle above is not torn, and seal the old holes. Lift the head with the bar and draw it with the hammer claw.
- Drill the pilot. Square to the roof, into the rafter center, to the depth your sheet gives: commonly the lag's embedment plus the roofing layers. Check your bit reaches that far before you start. If the bit goes slack after the deck, you missed: seal that hole and find the rafter again.
- Clean and backfill. Blow out the dust and fill the pilot with sealant. One maker's guide says to back fill using roof-compatible sealant at every attachment point.
- Slide the flashing in. Push it up under the lifted course until its hole sits over the pilot. It must lie flat. If it rocks, a nail is still there.
- Set the foot and start the lag by hand so it finds the pilot.
- Drive and stop at seated. Stop when the sealing washer is snug on the flashing. Check the foot is square to the rail line.
- Finish the course. Press the shingle back down and seal any missed pilots.
What most roof mount advice gets wrong
Most quick guides say to drive the lag with an impact driver and move on. The mount makers do not agree.
- Impact is not a universal yes. One racking maker's tool list has an impact driver for the lag bolts. Another says impact is strongly discouraged for all stainless steel hardware and calls for anti-seize. A third tells you to use caution to avoid over-torquing the lag if you use an impact.
- "Tight" is not the goal; "seated" is. One maker's guide shows the sealing washer level, under-torqued, over-torqued and tilted, and warns that too much torque could damage the washer. Most sheets give no lag torque number at all.
- Sealant is the backup, not the seal. Caulk round a flashing laid on top of the shingles is not a flashed mount.
Where your sheet allows impact, ease off as the washer touches. Where it does not, use a hand ratchet on the same socket.
Our perspective
One roof can mean twenty or forty attachments, and the time goes when a tool is in the truck instead of on the roof: a blunt bit halfway down a row, a socket that does not fit the lag. So we built the kit around one attachment, layout to seated lag, with both common pilot sizes ten deep and all three lag head sizes the sheets above call for.
Check the lags in the box against your sockets on the ground. Finding a 7/16 inch head on the roof with only 1/2 and 9/16 inch sockets stops the whole crew.
The tools for flashed roof attachments
The Teng Tools Roof Attachment Kit covers the hand work in the steps above:
- A 30 m (98 ft) closed case tape in metric and SAE for rafter and row layout.
- A 300 mm (11.8 in) compact pry bar with a forked tip to lift the shingle course and get under the nail heads.
- A 16 oz forged steel claw hammer to draw the nails and tap the bar under the course.
- A 9 mm snap-off blade knife with a locking wheel for underlayment and sealant tape.
- Ten 5.5 mm (about 7/32 inch) and ten 6.5 mm (about 1/4 inch) fully ground DIN 338 drill bits for the two common pilot sizes, so one blunt bit does not stop the row. They are standard jobber length, about 3.7 and 4 inch overall.
- 7/16, 1/2 and 9/16 inch impact sockets, 1/2 inch drive and 6 point: 7/16 for mounts that ship that lag head, 1/2 for 5/16 inch lags, 9/16 for 3/8 inch lags.
- A 3 piece 1/4 inch hex impact adaptor set, 1/4 inch hex to 1/4, 3/8 and 1/2 inch square, to run the sockets in an impact driver.
You bring the drill, impact driver, lags, flashings and sealant, plus a long series bit in your pilot size when the lag's embedment plus the roofing layers runs deeper than a jobber bit reaches. The sockets are standard depth, so if your mount's tool list calls for a deep socket, or a pilot size other than 5.5 or 6.5 mm, match the sheet. Browse the solar installer tool kits for other rooftop jobs, such as cutting rail and strut.
FAQ
What size pilot hole does a solar roof mount lag need?
Most flashed mounts for 5/16 inch lags call for a 7/32 inch pilot drilled into the center of the rafter. Some call for 1/4 inch instead, so the mount maker's sheet decides. Drill square to the roof and fill the hole with sealant before the flashing goes in.
What socket fits a solar mount lag bolt?
A standard 5/16 inch hex lag has a 1/2 inch head and a 3/8 inch lag has a 9/16 inch head. Some mounts ship their own lag with a 7/16 inch head, so check the lags in the box against your sockets before you climb.
Do I have to pull shingle nails to install solar flashing?
Yes, where they are in the way. The flashing has to slide up under the course above until it lies flat, and the nails holding that course stop it. Pull them carefully so the shingle above is not torn, and seal the old nail holes.
Can I drive solar lag bolts with an impact driver?
Many mount makers list an impact driver for the lags, but at least one strongly discourages impact on stainless hardware and others warn about over-torque. Follow your mount maker. Where impact is allowed, stop the moment the sealing washer is seated.
How tight should a solar mount lag bolt be?
Most flashed mount sheets give no torque number for the lag. They say fully seat it, or tighten until the sealing washer is snug against the flashing. A washer squeezed out past its edge or a dished flashing means it is too tight.
Sources
- XR Flush Mount Installation Manual, Version 5.2, IronRidge
- QuickMount ClickFit System Installation Guide, IronRidge
- SoloFlash Roof Mount Kit Installation Instructions, SunModo
- SolarMount Installation Guide, Unirac
- QMCS SolarMount-I Mount Installation Guide, Quick Mount PV
- Technical Bulletin TB-10026725-B, Installation of Solar Mounts, Owens Corning
- Asphalt Shingle Guidance, Mark S. Graham, Professional Roofing (NRCA), October 2022
- Wood Handbook, Chapter 8: Fastenings, USDA Forest Products Laboratory
- 29 CFR 1926.501, Duty to Have Fall Protection, OSHA
